Skip to content
CATBOQ

Quantity Takeoff Calculator

Consolidated excavation, concrete, brickwork, plaster and finishing quantities from building dimensions.

Indicative quantities from plan dimensions — verify against actual drawings
Inputs
Results
Excavation
55.44
cum
PCC
4.62
cum
Footing concrete
50.82
cum
Brickwork
72.26
cum
Plastering
628.32
Painting
628.32
Flooring
240

Indicative quantities using standard wall-run assumptions for internal partitions — always verify against actual approved drawings before use in a final BOQ.