Skip to content
CATBOQ

Excavation & Earthwork Calculator

Excavation, backfill and soil disposal volumes for a foundation pit or trench.

Per IS 1200 (Part 1) · Average end-area method
Inputs
Results
Excavation volume
141.94
cum
Backfill volume
141.94
cum
Net soil to dispose (bulked)
0
cum
Truck trips
0
8 cum tipper

Indicative volumes using a standard side-slope + bulking allowance for the selected soil type — actual site conditions may vary.