Construction Tender Estimate Checklist: 12 Checks Before Submission
Tender deadlines encourage speed, but a fast estimate is only useful when it covers the complete scope and reflects the commercial conditions. A short, disciplined review before submission can prevent omissions that later become margin loss or contractual disputes.
Scope and document checks
- Confirm that the latest drawing and specification revisions were used.
- Review addenda, clarifications, and pre-bid meeting notes.
- List exclusions, qualifications, provisional sums, and client-supplied items.
- Check that every BOQ section has been measured or deliberately allowed for.
Quantity and rate checks
- Review high-value quantities against drawing dimensions and independent benchmarks.
- Confirm material wastage, laps, leads, lifts, and productivity assumptions.
- Verify supplier and subcontractor quotations are current and scope-complete.
- Check arithmetic, units, section totals, taxes, overhead, and profit.
Risk and delivery checks
- Allow for mobilisation, temporary works, testing, permits, and supervision.
- Consider escalation, access limits, working hours, and programme constraints.
- Match payment terms and retention requirements to cash-flow assumptions.
- Complete a final commercial review and obtain the required internal approval.
Keep the submitted basis traceable
Archive the final BOQ, rates, quotations, assumptions, and submitted documents together. A traceable estimate helps the delivery team understand what was priced and gives management a reliable baseline for variation and cost-control decisions.